Guided MCS workflow
The whole-job compliance workflow I couldn't buy — so I built it.
Site-first, gated compliance for solar PV and battery installers, created entirely for the redeveloped MCS scheme. Every job is walked through against the standard, clause by clause — so a non-compliant job can't be filed by mistake.
The record builds itself as you work.
Structured. Gated. Evidenced.
One job, in the right order start to finish — so the work you file stands up, every step backed by its own record.
Site survey
Shading, pitch, orientation, load and occupancy captured on site.
Design & SLD
Ranked system options and a single-line diagram generated for you.
Install
Work through the job with checks surfaced at the stage they matter.
Evidence
Photos tagged to the clause they satisfy, as you go.
Handover
A complete, audit-ready pack — nothing left to chase afterwards.
Because it's gated, a non-compliant job can't be filed. The walkthrough is the everyday tool; being ready for audit is what you get for free at the end.
Join the beta
Early access for MCS-certified installers ahead of the 2027 transition.
MCS-certified installers·Built for 2027·No cost to join